BUILDINGS

03

EFFICIENT DISTRIBUTION

MASTER PLAN

PHASES

PHASE I

5 BUILDINGS

PHASE II

4 BUILDINGS

PHASE III

3 BUILDINGS

AMENITIES

Common Areas

Administrative and operational office in the park

Multipurpose common green areas for recreation

Heliport

Fire station

Drop lots

Security and Control Access

24/7 Security and access control

CCTV 24/7 monitored in site and remote

STANDARD SPECS

Clear height 33 ft (10.06 m)

 

Bay size 40 x 60 ft (12×18 m) 

Office spaces 3% building area

Roof system KR-18, 24-gauge sheet & 3” fiberglass insulation.

Natural Lighting 5% (Skylight)

 

Ventilation system 2 changes per hour

Fire protection system cabinet and hoses- ready for sprinkler

Lightning LED (100 lux)

Concrete Slab thickness 6” and load capacity 0.5 ton/SF

Tilt-Up Wall Concrete

Parking spot 1 / 2,152 SF (@200 m²)

Loading Dock 1 / 10,764 SF (@1,000 m²) 

Manual sectional dock door 8 x 10 ft

Ground Level Ramp 1 / 107,639 SF (@10,000 m²)

AVAILABLE SPACES

Start planning for a secure retirement today
Stay up to date

Copyright: © 2023 FinFlow WordPress theme by UiCore. All Rights Reserved.